DỰ ÁN ĐANG THI CÔNG
15/04/2026 03:52 PM 10 Lượt xem

      The East Pacific Foods Factory Project, located in My Phuoc 3 Industrial Park (Binh Duong), is a modern food processing facility requiring high standards in thermal insulation, hygiene, and durability.

      PROJECT INFORMATION
      DAIKIN VIETNAM HEADQUARTER BUILDING

      Project Overview
      The Daikin Vietnam Headquarter Building is a high-standard office development located in the center of Ho Chi Minh City, designed to provide a modern, professional, and efficient working environment.
      The project requires strict control over finishing quality, aesthetics, and functional performance, especially for office spaces where comfort, durability, and visual appearance are critical.
      Within this project, THAI NHAT VIET CO., LTD (TNV) participates as a finishing subcontractor, delivering key interior works that contribute directly to the overall quality and usability of the building.

      Project Location
      10 Cong Truong Quoc Te Street 
      Vo Thi Sau Ward, District 3 
      Ho Chi Minh City, Vietnam 

      Project Stakeholders
      Owner: Phuc Dat Investment Development JSC 
      Consultant: Minh Tung Construction Co., Ltd 
      Main Contractor: Shimizu Vietnam Co., Ltd 
      Subcontractor (Finishing Works): THAI NHAT VIET CO., LTD (TNV) 

      Scope of Work – THAI NHAT VIET
      THAI NHAT VIET is responsible for the supply and installation of interior finishing systems, including:
      1. Gypsum Wall & Ceiling System
      2. Carpet Flooring System
      3. Vinyl Flooring System
      4. Raised Floor System

      Technical Characteristics
      The finishing systems installed by TNV are designed to meet office building standards:
      High aesthetic quality and precision finishing 
      Good acoustic performance (carpet, ceiling systems) 
      Durability and wear resistance for high-traffic areas 
      Flexible systems supporting modern office layouts 
      Compatibility with MEP and IT infrastructure systems 

      Construction Method
      THAI NHAT VIET applies a controlled construction process:
      Preparation Phase
      Review of approved shop drawings 
      Material approval and mock-up (if required) 
      Site inspection and layout setting 
      Installation Phase
      Installation of gypsum wall and ceiling systems 
      Execution of flooring systems (carpet, vinyl) 
      Installation of raised floor system with precise leveling 
      Coordination with MEP systems 
      Finishing Phase
      Surface finishing and cleaning 
      Quality inspection and defect rectification 
      Final handover 


      Quality & Safety Management
      Compliance with project specifications and consultant requirements 
      Continuous supervision by QA/QC engineers 
      Strict finishing quality control (alignment, joints, surface flatness) 
      Full implementation of HSE standards on site 


      Project Contribution
      Through this project, THAI NHAT VIET demonstrates its capability in:
      Delivering high-end interior finishing for office buildings 
      Handling multiple finishing systems in one project 
      Ensuring precision, aesthetics, and functional performance 
      Coordinating effectively with international main contractors 