The East Pacific Foods Factory Project, located in My Phuoc 3 Industrial Park (Binh Duong), is a modern food processing facility requiring high standards in thermal insulation, hygiene, and durability.
PROJECT INFORMATION
DAIKIN VIETNAM HEADQUARTER BUILDING
Project Overview
The Daikin Vietnam Headquarter Building is a high-standard office development located in the center of Ho Chi Minh City, designed to provide a modern, professional, and efficient working environment.
The project requires strict control over finishing quality, aesthetics, and functional performance, especially for office spaces where comfort, durability, and visual appearance are critical.
Within this project, THAI NHAT VIET CO., LTD (TNV) participates as a finishing subcontractor, delivering key interior works that contribute directly to the overall quality and usability of the building.
Project Location
10 Cong Truong Quoc Te Street
Vo Thi Sau Ward, District 3
Ho Chi Minh City, Vietnam
Project Stakeholders
Owner: Phuc Dat Investment Development JSC
Consultant: Minh Tung Construction Co., Ltd
Main Contractor: Shimizu Vietnam Co., Ltd
Subcontractor (Finishing Works): THAI NHAT VIET CO., LTD (TNV)
Scope of Work – THAI NHAT VIET
THAI NHAT VIET is responsible for the supply and installation of interior finishing systems, including:
1. Gypsum Wall & Ceiling System
2. Carpet Flooring System
3. Vinyl Flooring System
4. Raised Floor System
Technical Characteristics
The finishing systems installed by TNV are designed to meet office building standards:
High aesthetic quality and precision finishing
Good acoustic performance (carpet, ceiling systems)
Durability and wear resistance for high-traffic areas
Flexible systems supporting modern office layouts
Compatibility with MEP and IT infrastructure systems
Construction Method
THAI NHAT VIET applies a controlled construction process:
Preparation Phase
Review of approved shop drawings
Material approval and mock-up (if required)
Site inspection and layout setting
Installation Phase
Installation of gypsum wall and ceiling systems
Execution of flooring systems (carpet, vinyl)
Installation of raised floor system with precise leveling
Coordination with MEP systems
Finishing Phase
Surface finishing and cleaning
Quality inspection and defect rectification
Final handover
Quality & Safety Management
Compliance with project specifications and consultant requirements
Continuous supervision by QA/QC engineers
Strict finishing quality control (alignment, joints, surface flatness)
Full implementation of HSE standards on site
Project Contribution
Through this project, THAI NHAT VIET demonstrates its capability in:
Delivering high-end interior finishing for office buildings
Handling multiple finishing systems in one project
Ensuring precision, aesthetics, and functional performance
Coordinating effectively with international main contractors