Our construction company builds durable, cost-effective projects, combining expert craftsmanship and innovation to meet every client's expectations.
4th Floor, 129E Nguyen Dinh Chinh St., Phu Nhuan Ward, HCMC, Vietnam
The Daikin Vietnam Headquarter Building is a high-standard office development located in the center of Ho Chi Minh City, designed to provide a modern, professional, and efficient working environment.
PROJECT INFORMATION
EAST PACIFIC FOODS FACTORY – SANDWICH PANEL WORKS
Project Overview
The East Pacific Foods Factory Project, located in My Phuoc 3 Industrial Park (Binh Duong), is a modern food processing facility requiring high standards in thermal insulation, hygiene, and durability.
Within this project, THAI NHAT VIET CO., LTD (TNV) is assigned as the subcontractor specializing in sandwich panel installation, focusing on key construction areas that directly impact the building envelope and internal controlled environments.
Scope of Work – THAI NHAT VIET
THAI NHAT VIET is responsible for the supply and installation of sandwich panel systems in the following main categories:
1. External Sandwich Panel (Facade)
Installation of sandwich panel cladding for building exterior
Ensuring weather resistance, waterproofing, and thermal insulation
Coordination with structural steel frame and facade system
2. Internal Panel System (Wall & Ceiling)
Installation of panel wall partitions inside the factory
Installation of panel ceiling systems for production areas
Providing smooth, hygienic, and easy-to-clean surfaces
Suitable for controlled industrial environments
3. Cold Room Panel System
Installation of insulated panels for cold storage areas
Ensuring high airtightness and thermal performance
Installation of cold room joints, connections, and sealing systems
Supporting stable temperature control for food storage
Technical Characteristics
The sandwich panel systems installed by TNV meet the following requirements:
Core materials: PU / PIR panels (for high insulation performance)
Excellent thermal insulation and energy efficiency
High airtightness and moisture resistance
Smooth surface suitable for food-grade environments
Durable and resistant to industrial operating conditions
Construction Method
THAI NHAT VIET implements a controlled and standardized installation process:
Preparation Phase
Review approved shop drawings
Material inspection and approval
Site survey and layout marking
Installation Phase
Installation of supporting structures
Erection of external facade panels
Installation of internal wall and ceiling panels
Installation of cold room panels with strict joint control
Finishing Phase
Sealing joints using specialized sealants
Surface cleaning and alignment check
Final inspection and handover
Quality & Safety Management
Compliance with approved method statement and technical specifications
Continuous supervision by site engineers and QA/QC team
Strict control of installation tolerances and joint quality
Full implementation of HSE standards on site
.jpg)




